The AV system was designed to provide the ideal collaborative solution for your team. Perfectly aligned to cast its laser image onto the projection screen while centered exactly on the custom ceiling tile, the projector would descend on a scissor lift at the touch of a button. The equipment order had been placed and the trades were meticulously scheduled. And then, well into the project; a request was made to change the room’s prominent light fixture and consequently, its location. Its new position would place it directly in front of the projector’s path.  It may not sound like a complex issue but repositioning the projector may require either a short or long-throw lens be added, or a longer scissor-lift be specified. The electrical drop may also need to be relocated along with moving any other affected ceiling features. Audio visual systems are integral to any collaborative space and changes to a room’s walls, ceiling, flooring, lighting or furnishings may have a ripple effect that could result in costly change orders and extend your project’s timeline.

Typical video conferencing-enabled spaces will feature either a flat panel display, videowall matrix or projection system, along with microphones, speakers, AV equipment and room control device such as a pop-up touch panel. These elements are all part of an expertly engineered system, each with precise locations carefully documented. If, for example, a change is made replacing the specified 2-pedestal boardroom table with an extended 3-pedestal table, additional in-ceiling speakers or microphones may be required. Placement of these components will likely affect adjacent ceiling features including fire sprinklers, HVAC, occupancy sensors and lighting fixtures. Switching from 2 to 3 pedestals also shifts the locations of the floor boxes for power and connectivity. While these issues can be resolved through collaborative redesign and coordination with other trades, they will certainly impact the project’s timeline and budget.

Change orders happen and for a variety of reasons. Custom items may encounter unforeseen delays. Furniture specified months earlier may be discontinued or the designer or client may have requested a change.  Regardless of the circumstances, collaboration among stakeholders at the onset of change is the key to successful project outcomes.